Algorithm Search⌘K

Problemadvanced

Truthful scheduling on unrelated machines

Also called Nisan-Ronen scheduling problem.

Assign jobs to selfish machines that privately know their processing times, with payments that make truth telling dominant, to minimize the makespan. VCG has ratio n.

In truthful scheduling on unrelated machines, each machine is a selfish agent that privately knows how long it needs for each job, and the mechanism must assign the jobs and pay the machines so that reporting the true times is a dominant strategy, while keeping the makespan small. The problem was posed by Nisan and Ronen (1999) and started algorithmic mechanism design. This page is about the problem, its variants and all the known bounds. Its close page, the Nisan-Ronen theorem, is about one result: no deterministic truthful mechanism has approximation ratio below nn, which shows that the simple VCG mechanism is optimal.

In plain words

A company has some jobs and some computers owned by different people. Each owner knows how long its computer needs for each job, and nobody else knows. The company asks the owners for these times, chooses which computer runs which job, and pays the owners. Each owner wants to be paid as much as possible for as little work as possible. The company wants all jobs done as early as possible. The question is how close to the best finishing time the company can get, if its rule must make honest answers the best plan for every owner. The answer for rules without chance is surprising: the simplest rule, which gives each job to the fastest computer, is the best possible, even though it can be many times slower than the best plan.

Definition

There are nn machines and mm jobs. Machine ii needs time tij≥0t_{ij} \ge 0 for job jj, and the vector ti=(ti1,…,tim)t_i = (t_{i1}, \dots, t_{im}) is its private type. A mechanism asks each machine for a vector bi∈R≥0mb_i \in \mathbb{R}_{\ge 0}^m and returns

  • an allocation A1,…,AnA_1, \dots, A_n, a partition of the jobs among the machines, and
  • payments q1,…,qnq_1, \dots, q_n to the machines.

Machine ii has utility qi−∑j∈Aitijq_i - \sum_{j \in A_i} t_{ij}, the payment minus its work. This is a cost setting. In the convention of this area the payment by agent ii is pi=−qip_i = -q_i, and the valuation of machine ii for an allocation is −∑j∈Aitij-\sum_{j \in A_i} t_{ij}. The mechanism is truthful if reporting bi=tib_i = t_i maximizes the utility of machine ii for every report of the others, which is DSIC.

The objective is the makespan of the true times,

MS(A,t)=max⁡i∑j∈Aitij,\mathrm{MS}(A, t) = \max_{i} \sum_{j \in A_i} t_{ij},

and a mechanism has approximation ratio ρ\rho if MS(A(t),t)≤ρ⋅OPT(t)\mathrm{MS}(A(t), t) \le \rho \cdot \mathrm{OPT}(t) for every tt. The question is the smallest ρ\rho that a truthful mechanism can reach, with no limit on running time. Without the incentive constraint this is the unrelated machine scheduling problem.

The tool for lower bounds is weak monotonicity, the 2-cycle case of cycle monotonicity, in cost form. Fix the reports of the other machines. If machine ii with type tit_i gets the set AA and with type ti′t_i' gets the set A′A', then

∑j∈A(tij′−tij)  ≥  ∑j∈A′(tij′−tij).\sum_{j \in A} (t_{ij}' - t_{ij}) \;\ge\; \sum_{j \in A'} (t_{ij}' - t_{ij}).

In words: measured by the change of times, the new set A′A' must be at least as favorable to the new report as the old set AA. A machine that lowers some of its times cannot end up with a set on which its times went up, compared with the old set.

Variants

  • Deterministic or randomized. Deterministic mechanisms must be DSIC. Randomized ones are usually required to be truthful in expectation or universally truthful. Fractional mechanisms may split a job among machines.
  • Related machines. Machine ii has one private speed, and tij=wj/sit_{ij} = w_j / s_i for public job sizes wjw_j. This is a single-parameter environment in cost form, and the incentive condition is a monotone allocation rule: a machine that reports itself slower must not get more work. See uniform machine scheduling.
  • Restricted value sets. Lavi and Swamy (2007 conference, 2009 journal) studied the case where each job has only two possible times, low or high, and gave a deterministic truthful 2-approximation by checking cycle monotonicity.
  • Anonymous mechanisms. If the mechanism treats machines symmetrically, the ratio is at least nn (Ashlagi, Dobzinski and Lavi 2012).
  • Other objectives. For the total work, the sum of the loads, VCG is optimal and truthful. The difficulty comes from the min-max objective.

Examples

VCG. Give each job to the machine with the smallest reported time, with a fixed tie-breaking order, and pay that machine the second smallest reported time for the job. Each job is a separate Vickrey auction in cost form, so the mechanism is truthful.

A small instance where VCG is bad. Take nn machines and nn jobs. Machine 1 needs time 1 for every job, and every other machine needs time 1+ε1 + \varepsilon for every job. VCG gives all nn jobs to machine 1, with makespan nn. Giving one job to each machine has makespan 1+ε1 + \varepsilon. The ratio tends to nn as ε→0\varepsilon \to 0.

The lower bound 2, by hand. Take two machines and three jobs, with

t1=(1,100,1),t2=(100,1,1).t_1 = (1, 100, 1), \qquad t_2 = (100, 1, 1).

The optimal makespan is 2. Suppose a truthful mechanism has ratio at most 2−δ2 - \delta for some δ>0\delta > 0. On this instance its makespan is below 4, so job 1 goes to machine 1 and job 2 to machine 2. By symmetry assume job 3 goes to machine 2, so machine 1 gets A={1}A = \{1\}. Now let machine 1 report

t1′=(0,100,1+ε),t_1' = (0, 100, 1 + \varepsilon),

with ε>0\varepsilon > 0 so small that 2/(1+ε)>2−δ2 / (1 + \varepsilon) > 2 - \delta. The optimum is now 1+ε1 + \varepsilon: machine 1 takes jobs 1 and 3. Any allocation that gives job 3 to machine 2 has makespan at least 2, which is too much, so machine 1 gets A′={1,3}A' = \{1, 3\}. The change of times is t1′−t1=(−1,0,ε)t_1' - t_1 = (-1, 0, \varepsilon). Its sum over A={1}A = \{1\} is −1-1, and its sum over A′={1,3}A' = \{1, 3\} is −1+ε-1 + \varepsilon. Weak monotonicity requires −1≥−1+ε-1 \ge -1 + \varepsilon, which is false. So no truthful mechanism has ratio below 2. For n>2n > 2 machines, add machines with time 1000 for every job. A mechanism with ratio below 2 never uses them, and the argument is unchanged. This short proof is due to Mu'alem and Schapira; Nisan and Ronen proved the same bound.

Known algorithms

  • VCG, ratio nn, polynomial time, deterministic and truthful. Its makespan is at most ∑jmin⁡itij\sum_j \min_i t_{ij}, and every schedule has makespan at least 1n∑jmin⁡itij\frac{1}{n} \sum_j \min_i t_{ij}, so the ratio is at most nn.
  • Randomized mechanisms for two machines. Nisan and Ronen gave a universally truthful randomized mechanism for two machines with ratio 7/47/4.
  • Fractional mechanisms. Christodoulou, Koutsoupias and Kovacs (2010) studied mechanisms that split jobs. The best known upper bound for fractional and for randomized mechanisms is (n+1)/2(n + 1)/2, as stated in their 2023 overview.
  • Related machines. Archer and Tardos (2001) showed that an optimal allocation, with a fixed tie-breaking order, is monotone, so it can be made truthful in exponential time, and gave a randomized 3-approximation that is truthful in expectation. Christodoulou and Kovacs (2013) gave a deterministic truthful PTAS.
  • Without incentives, the Lenstra-Shmoys-Tardos algorithm is a 2-approximation, and no polynomial algorithm beats 3/23/2 unless P = NP (inapproximability). The truthfulness bounds below hold even without limits on running time, so they come from incentives, not from computation.

Bounds

For deterministic truthful mechanisms on nn unrelated machines, the upper bound is nn (VCG). The lower bounds:

Paper Lower bound Authors
STOC 1999, GEB 2001 2 Nisan and Ronen
Algorithmica 2009 1+2≈2.4141 + \sqrt{2} \approx 2.414 for n≥3n \ge 3 Christodoulou, Koutsoupias and Vidali
Algorithmica 2012 1+φ≈2.6181 + \varphi \approx 2.618 as n→∞n \to \infty Koutsoupias and Vidali
Algorithmica 2021 ≈2.755\approx 2.755 Giannakopoulos, Hammerl and Pocas
arXiv 2020 3 Dobzinski and Shaulker
FOCS 2021 1+n−11 + \sqrt{n - 1} Christodoulou, Koutsoupias and Kovacs
STOC 2023 nn Christodoulou, Koutsoupias and Kovacs

So the optimal ratio for deterministic truthful mechanisms is exactly nn. For anonymous mechanisms the bound nn was known earlier (Ashlagi, Dobzinski and Lavi 2012).

For randomized and fractional mechanisms, the best known lower bound is about 2, from Mu'alem and Schapira and from Christodoulou, Koutsoupias and Kovacs (2010), and the best known upper bound is (n+1)/2(n + 1)/2. Closing this gap is open.

Reductions

  • From multi-parameter to single-parameter. Related machines are the special case where each type is one number times a public vector, and there the problem becomes as easy as without incentives, up to the PTAS. The hardness of the unrelated case comes from the vector types.
  • Lower bounds through weak monotonicity. All the lower bounds above use only weak monotonicity on small instances embedded in larger ones. Since every truthful mechanism satisfies it, the bounds hold for all truthful mechanisms, whatever their running time.
  • VCG is an affine maximizer. VCG maximizes minus the total work, a weighted sum. The min-max objective is not affine. The scheduling domain is not unrestricted, so Roberts' theorem does not apply directly, and the bound nn needed a new proof.

Applications

  • Outsourcing computation. Jobs are sent to computers owned by others, such as in grid or cloud computing, where the owners know their own speeds.
  • Routing and networks. Nisan and Ronen used the problem, with shortest paths, as the first examples of mechanism design for algorithmic problems.
  • Selfish load balancing. The load balancing game studies the same machines when jobs are the selfish agents and there are no payments, a different model.

References

  1. Noam Nisan and Amir Ronen, Algorithmic mechanism design, Games and Economic Behavior 35(1-2) (2001), 166-196 (conference version in STOC 1999), the scheduling problem for unrelated machines, the VCG upper bound n, the lower bound 2 for deterministic truthful mechanisms, and the randomized mechanism for two machines
  2. George Christodoulou, Elias Koutsoupias and Annamaria Kovacs, A proof of the Nisan-Ronen conjecture, Proceedings of the 55th ACM Symposium on Theory of Computing (STOC 2023), 672-685, the lower bound n for deterministic truthful mechanisms
  3. Ahuva Mu'alem and Michael Schapira, Setting lower bounds on truthfulness, Games and Economic Behavior 110 (2018), 174-193, the short weak-monotonicity proof of the lower bound 2 and the lower bound for randomized mechanisms
  4. Aaron Archer and Eva Tardos, Truthful mechanisms for one-parameter agents, Proceedings of the 42nd IEEE Symposium on Foundations of Computer Science (FOCS 2001), 482-491, related machines as a one-parameter problem, the monotone optimal algorithm and the randomized 3-approximation
  5. George Christodoulou and Annamaria Kovacs, A deterministic truthful PTAS for scheduling related machines, SIAM Journal on Computing 42(4) (2013), 1572-1595, the deterministic truthful PTAS for related machines
  6. Itai Ashlagi, Shahar Dobzinski and Ron Lavi, Optimal lower bounds for anonymous scheduling mechanisms, Mathematics of Operations Research 37(2) (2012), 244-258, the lower bound n for anonymous truthful mechanisms
  7. George Christodoulou, Elias Koutsoupias and Annamaria Kovacs, Mechanism design for fractional scheduling on unrelated machines, ACM Transactions on Algorithms 6 (2010), Article 2, fractional truthful mechanisms and their bounds

Where this leads

About this page

The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.

LadderLevelWhat the next level needs
Human proofH0 no proof
  • add a proof in proofs/ (06.5)
LeanL0 no Lean part
  • name a Lean module in the lean field (07)
VisualV0 none
  • add viz/scene.ts or a figure (10)
WritingW2 basic
  • a known algorithm
  • a contract.yaml