Algorithm Search⌘K

Definitionintro

Makespan

Also called completion time of the schedule, maximum completion time, schedule length.

The completion time of the last job in a schedule, the objective of most scheduling problems.

The completion time of the last job in a schedule, the objective of most scheduling problems.

About this page

The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.

LadderLevelWhat the next level needs
Human proofH0 no proof
  • add a proof in proofs/ (06.5)
LeanL0 no Lean part
  • name a Lean module in the lean field (07)
VisualV0 none
  • add viz/scene.ts or a figure (10)
WritingW0 stub
  • one source with a locator