Modelcore
Path delay fault model
Also called path delay fault.
A fault model in which the total delay of one path exceeds the clock period, tested by a two-pattern test that launches a transition down the path.
The path delay fault model describes a timing defect as a path of a circuit whose total delay is too large. A fault is a path from an input to an output together with the direction of the transition at its start, rising or falling. The fault is present when a transition launched at the start of the path reaches the end later than the clock period allows. Unlike the transition fault model, it catches a sum of small extra delays spread along a path, but a circuit can have a number of paths that is exponential in its size, so only a selected list of paths is tested.
The machine
The circuit is a combinational gate circuit between launch points (primary inputs or flip-flops) and capture points (primary outputs or flip-flops), clocked with period . A path is a sequence of lines where is a launch point, is a capture point, and each is a gate (or fanout branch) with as one of its inputs, called the on-path input. The other inputs of are its off-path inputs. A path delay fault is a pair or : a rising or falling transition at . The direction at each later line follows from the inversions along the path.
The assumptions are:
- Delay of a path. Each gate has a delay for a rising and for a falling output, and the delay of for the transition is the sum along the path. The fault is present when this sum exceeds minus the setup time of the capture point (see setup and hold constraints).
- One faulty path. The test is judged for one path at a time. Whether other paths are also slow is left open, and the robust and non-robust classes below differ in how they treat it.
A test is a pair of vectors . It must launch the transition at , so in the right direction, and it must sensitize the path, so that a late arrival along makes the value captured at wrong. The conditions on the off-path inputs that make this sure define the robust and non-robust tests.
What it counts
The model predicts which paths a test set has checked for timing, and so the path delay fault coverage: the fraction of the faults of a path list that the tests detect, often split into robustly and non-robustly detected. The list is chosen first. All paths are too many in most circuits, so tools take the paths that static timing analysis reports as longest, or the longest path through each line. The coverage is a fraction of that list, and a report should give the list.
Take , , , with the stem and its branches and . It has four paths from an input to : , , and , so 8 path delay faults. For , the second vector must set , the off-path input to 1 so that follows , and the off-path input to 1 so that follows , which gives . With , rises, falls, rises, and and stay at 1 throughout. If the path is slow, still holds 0 at the capture, and the fault is detected whatever the delays of the other lines, since no line off the path changes.
Relation to other models
- Transition faults. A transition fault puts a gross delay on one line, and a transition test may propagate it along any path. A path delay test fixes the path, so it can detect small delays on long paths. The two models count differently: transition faults against two faults per path.
- Static timing analysis. Static timing analysis bounds the delay of every path without vectors, on the timing graph. The path delay model checks the paths on silicon. A path that no vector pair can sensitize is a false path for timing, and its path delay faults are untestable.
- Scan launch. In a scan design, the pair comes from launch on shift or launch on capture, which restricts which pairs can be applied.
- Segment and gate delay faults. Intermediate models put the extra delay on a segment of a path of bounded length, between the path and the single line.
Known results in the model
- The number of paths can be exponential. Take stages. Stage has the line , two new inputs and , two gates and , and the output , with an input. The circuit has gates and lines, counting the two branches of each . Claim: the number of paths from to is . Proof. By induction on . For there is one path. A path from to ends with , and its line before is or . Each of these is reached from only, through its own branch, since and are inputs. So the paths to are the paths to extended in two ways, and their number doubles. So the circuit has path delay faults on these paths. Each of them has a test: for each stage, set the side input of the on-path AND to 1 and the side input of the other AND to 0, in both vectors, and launch the transition at . Then every off-path input of the path is constant and non-controlling, and the transition runs along the path alone.
- Counting paths is linear. The number of paths into each line is the sum of the numbers of paths into its inputs, with 1 at each launch point. In topological order this takes time for lines and gate input pins, so the number of faults can be found without listing them. In the same way, the longest path through each line is a longest path in a DAG, which gives the path list that test tools target.
- Untestable paths. Replace the stage of the example by , and . The path count is still , but the side input of each OR is now the complement of the on-path input, so the OR is constant 1, no path propagates a transition, and all path delay faults are untestable. In real circuits a large share of paths is untestable or has no robust test, which is why coverage is reported over a list or over the testable paths.
- Hardness. Deciding whether a path delay fault has a test, robust or not, is NP-complete. It is in NP, since a vector pair is a certificate that can be checked in polynomial time. For hardness, take a circuit for a SAT instance, a new input , and the output . The path with a rising transition has a test exactly when can be 1: a test needs the off-path input at 1 in , and any satisfying assignment, held in both vectors, keeps at a steady 1, which meets the robust conditions too.
References
- G. L. Smith, Model for delay faults based upon paths, Proceedings of the International Test Conference, 342 to 349, 1985, the path delay fault, with a rising or falling transition at the start of a path, and its two-pattern tests
- C. J. Lin and S. M. Reddy, On delay fault testing in logic circuits, IEEE Transactions on Computer-Aided Design CAD-6(5), 694 to 703, September 1987, robust and non-robust tests of path delay faults and their generation
- Michael L. Bushnell and Vishwani D. Agrawal, Essentials of Electronic Testing for Digital, Memory and Mixed-Signal VLSI Circuits, Kluwer, 2000, the chapter Delay Test (path delay faults, path counts, robust and non-robust tests)
Where this leads
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W4 complete |
|
Tag C4VGK0 Edit this page History Report an error Markdown