Conceptintro
Work-conserving scheduler
Also called work-conserving.
A scheduler that never leaves a resource idle while work is waiting.
A scheduler that never leaves a resource idle while work is waiting.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag VBE4E8 Edit this page History Report an error