Algorithmintro
Shortest-job-first scheduling
Also called shortest job next, SJF, SPT.
Run the job with the smallest expected run time next.
Run the job with the smallest expected run time next.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag GK26MR Edit this page History Report an error