Problemadvanced
Scheduling with setup times
Also called sequence-dependent setup scheduling.
Machines need a setup between jobs of different classes.
Machines need a setup between jobs of different classes.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag KEC6PH Edit this page History Report an error