Problemadvanced
Prize-collecting Steiner tree
Also called PCST.
Connect a subset of vertices, paying edge costs and losing prizes for unconnected vertices.
Connect a subset of vertices, paying edge costs and losing prizes for unconnected vertices.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag 95VAJ4 Edit this page History Report an error