Problemcore
Preemptive makespan scheduling
Also called P|pmtn|Cmax.
Jobs may be interrupted and resumed; minimize makespan on identical machines.
Jobs may be interrupted and resumed; minimize makespan on identical machines.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag XFVFMK Edit this page History Report an error