Techniqueadvanced
Method of pessimistic estimators
Also called pessimistic estimator method.
Extends conditional expectations by replacing an intractable expectation with a computable upper bound that is preserved at each step.
Extends conditional expectations by replacing an intractable expectation with a computable upper bound that is preserved at each step.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag 9RJGHX Edit this page History Report an error