Algorithm Search⌘K

Data structurecore

Partial-order plan

Also called partially ordered plan.

A plan whose steps carry ordering constraints instead of a total order.

A plan whose steps carry ordering constraints instead of a total order.

About this page

The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.

LadderLevelWhat the next level needs
Human proofH0 no proof
  • add a proof in proofs/ (06.5)
LeanL0 no Lean part
  • name a Lean module in the lean field (07)
VisualV0 none
  • add viz/scene.ts or a figure (10)
WritingW0 stub
  • The abstract type
  • one source with a locator