Problemadvanced
Online flow time minimization
Also called online total flow time, online weighted flow time.
Jobs are released online and the total (weighted) flow time must be minimized.
Jobs are released online and the total (weighted) flow time must be minimized.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag 0HW8KH Edit this page History Report an error