Problemadvanced
Minimizing the number of late jobs
Also called 1||sum Uj.
Maximize the number of jobs that finish by their due dates on one machine.
Maximize the number of jobs that finish by their due dates on one machine.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag XREAH5 Edit this page History Report an error