Problemcore
Makespan minimization on identical machines
Also called P||Cmax, multiprocessor scheduling, identical-machine scheduling.
Assign jobs to m identical machines to minimize the makespan.
Assign jobs to m identical machines to minimize the makespan.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag 5MX7DT Edit this page History Report an error