Algorithm Search⌘K

Theoremadvanced

Liu-Layland utilization bound

Also called rate-monotonic utilization bound.

N tasks under rate-monotonic priorities are schedulable if utilization is at most n(2^(1/n)-1).

N tasks under rate-monotonic priorities are schedulable if utilization is at most n(2^(1/n)-1).

About this page

The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.

LadderLevelWhat the next level needs
Human proofH0 no proof
  • add a proof in proofs/ (06.5)
LeanL0 no Lean part
  • name a Lean module in the lean field (07)
VisualV0 none
  • add viz/scene.ts or a figure (10)
WritingW0 stub
  • Statement
  • one source with a locator