Algorithmcore
Knapsack FPTAS (Ibarra-Kim)
Also called Ibarra-Kim algorithm, Ibarra-Kim knapsack approximation.
Scale item profits, then run profit-indexed dynamic programming, giving a (1-ε)-approximation in time polynomial in n and 1/ε.
Scale item profits, then run profit-indexed dynamic programming, giving a (1-ε)-approximation in time polynomial in n and 1/ε.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag 8ZRYG2 Edit this page History Report an error