Algorithmadvanced
Hochbaum-Shmoys PTAS for makespan scheduling
Also called Hochbaum-Shmoys scheduling PTAS.
Dual approximation with rounding of job sizes and dynamic programming over large jobs, giving a PTAS for identical-machine makespan minimization.
Dual approximation with rounding of job sizes and dynamic programming over large jobs, giving a PTAS for identical-machine makespan minimization.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag AYZTA8 Edit this page History Report an error