Problemadvanced
Generalized assignment problem
Also called GAP.
Assign jobs to machines with machine capacities, minimising total assignment cost.
Assign jobs to machines with machine capacities, minimising total assignment cost.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag C846S9 Edit this page History Report an error