Problemadvanced
Minimizing flow time
Also called weighted flow time, response time.
Minimize total (weighted) time jobs spend in the system.
Minimize total (weighted) time jobs spend in the system.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag FGZ81Z Edit this page History Report an error