Conceptcore
Critical path
Also called critical path length, longest path in a DAG.
The longest weighted path through a computation DAG, which equals its span.
The longest weighted path through a computation DAG, which equals its span.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag AF18VA Edit this page History Report an error