Conceptintro
Amortized versus worst-case cost
Also called amortized vs worst-case bound.
Amortized bounds guarantee total cost over a sequence, while worst-case bounds guarantee each single operation.
Amortized bounds guarantee total cost over a sequence, while worst-case bounds guarantee each single operation.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag 0WHR9K Edit this page History Report an error