Conceptcore
Amortized versus expected cost
Also called expected amortized cost.
Amortized analysis averages over operations deterministically, while expected cost averages over random choices.
Amortized analysis averages over operations deterministically, while expected cost averages over random choices.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag 57RJ85 Edit this page History Report an error