Conceptcore
Amortized update time
Also called amortized update cost.
Average cost per update over a sequence, the usual measure for dynamic graph algorithms.
Average cost per update over a sequence, the usual measure for dynamic graph algorithms.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag NXSGF8 Edit this page History Report an error