Conceptintro
Admission control
Also called load shedding.
Decide at entry whether to accept new work so that the system stays within capacity.
Decide at entry whether to accept new work so that the system stays within capacity.
About this page
The build computes these levels from the evidence in the repository. Each row says what the next level needs. Read what the levels mean.
| Ladder | Level | What the next level needs |
|---|---|---|
| Human proof | H0 no proof |
|
| Lean | L0 no Lean part |
|
| Visual | V0 none |
|
| Writing | W0 stub |
|
Tag W9QGBX Edit this page History Report an error